Fire

Hot work, fire, and combustibles

Fires started by sparks and slag from welding, cutting, and grinding, plus burns from hot metal. 29 CFR 1926.352 requires moving or protecting combustibles and having fire extinguishing equipment ready during hot work.

Where it shows up

  • Welding and cutting near wood framing or insulation
  • Torch-down roofing
  • Grinding near stored materials
  • Cutting on tanks or pipes that held flammables

Controls, most effective first

Work down the list. Rely on PPE only for the risk the controls above it cannot remove.

LevelControl
Eliminate or substituteUse cold cutting, bolting, or press fittings in place of hot work where possible
EngineeringMove combustibles away, or cover them with fire-resistant blankets
Store oxygen cylinders at least 20 feet from fuel-gas cylinders and combustibles such as oil or grease, or behind a noncombustible barrier at least 5 feet high with at least a half-hour fire-resistance rating
Fire extinguisher at the work location
AdministrativeHot work permit, if your company or the owner requires one
Fire watch during and after the work when the standard or permit requires it
Check for hidden combustibles behind walls and below floors
PPEWelding helmet, jacket, and gloves
Flame-resistant clothing

PPE to list on the JHA

Welding helmet, jacket, and gloves1926.102Flame-resistant clothingSafety glasses with side protection1926.102

OSHA standards

CitationTitle
29 CFR 1926.350Gas welding and cutting
29 CFR 1926.352Fire prevention
29 CFR 1926.150Fire protection

Federal OSHA construction standards. State plans can be stricter, and owners or contracts can add requirements. This page is general information. Check the full standard for your work.

Related hazards